Project details
Phase 1
- Bulk excavation and muck-shift
- 1.7 meter reduction overall
- Redirecting live drains to allow for excavation
- Excavation of strip foundations a further 1.5 meters
- Casting of strip foundations in C45 concrete
- Installation of rebar mesh and building of shutters
- Casting of 300m main floor slab
- Full draining package including attenuation tank built and fitted including pump system
Phase 2
- Installation and completion for the build
- Remediation and general landscaping around the build
- Installation of 375 sq meter heated tarmac drive