Leeds – Full groundworks package

Project details

Phase 1

  • Bulk excavation and muck-shift
  • 1.7 meter reduction overall
  • Redirecting live drains to allow for excavation
  • Excavation of strip foundations a further 1.5 meters
  • Casting of strip foundations in C45 concrete
  • Installation of rebar mesh and building of shutters
  • Casting of 300m main floor slab
  • Full draining package including attenuation tank built and fitted including pump system

 

Phase 2

  • Installation and completion for the build
  • Remediation and general landscaping around the build
  • Installation of 375 sq meter heated tarmac drive