Cattal – Drive installation

Project details

  • 1 metre reduction from original level due to poor ground
  • 540 tonne muck shift
  • 600 mm of 6F5 stone limestone build up
  • 120 mm of kerbing laid on C35 concrete
  • 300 mm of type 1 limestone
  • Installation of S100 aco’s
  • 70 mm tarmac base coat
  • 30 mm SMA 10 mm top coat