Cattal – Drive installation
Cattal – Drive installation
Project details
- 1 metre reduction from original level due to poor ground
- 540 tonne muck shift
- 600 mm of 6F5 stone limestone build up
- 120 mm of kerbing laid on C35 concrete
- 300 mm of type 1 limestone
- Installation of S100 aco’s
- 70 mm tarmac base coat
- 30 mm SMA 10 mm top coat